CE

Pre-Wire Sign-Off

Copper Electrical — Rough-In Inspection
R————
0%
An unfinished inspection was found.
📋Job Information01
Simpro auto-fill requires backend configuration. Enter site details manually for now.
Required
AUTO
Form letter (change for additional sheets on this job):
Built from the Simpro job number. Override manually
Auto-fills from the Simpro job number once connected — edit to override.
Required
Required
Loading…AUTO-STAMPED
📐Plan Details02
🔧Incomplete Sections03
💡Final Check — Lighting04
🔌Final Check — Power05
Cooktop circuit installed?
Cooktops
Oven / stove circuit installed?
Ovens / Stoves
Hot Water System (HWS) circuit installed?
Hot Water Systems
Air conditioning circuit installed?
AC Units
Zip / Billi tap (instant hot / chilled) circuit installed?
Zip / Billi Taps
Dedicated Sub-Circuits
Any Other Dedicated Circuits
📡Final Check — TV / Data06
Final Check — Mains & MSB07
🗂️Circuit Planning & Switchboard Schedule08
Complete on site to generate a draft switchboard schedule for the fit-off team. Appliance & dedicated circuits from Section 05 are pulled into the main switchboard automatically.
Main Switchboard (MSB)
XLPE — core type set by supply.
General power only — excludes dedicated circuits (those come from Section 05).
CCTDescriptionDeviceRatingCablePhaseRCD
Additional Distribution Boards
Add any sub-boards on this site (granny flat, garage, pool equipment, etc.). You can add as many as needed.
☀️Final Check — Solar / Renewables09
📸Photos & Measurements10
All other photos should be uploaded to the Google Drive project folder.
📷
Tap to take a photo or select from library
Plans marked up on site — circuit numbers, circuit detailing notes, set-out, etc.
🗒️
Tap to upload marked-up plans (image or PDF)
Sign Off11
Please confirm gyprock readiness
📬 Submission will notify the project manager that the job is ready for gyprock.
Sign below using your finger or stylus.
Signature required
Submitting sends the sheet — including signature, photos and marked-up plans — to the office.